Oversaw the art department team and deligated responsibilities that suited each indivudiual the best. Oversaw progress of the set building and made sure vision was brought to life correctly. Made sure each set was dressed and ready for production shooting days - all props were ready to go and set. Oversaw continuity of props used by actors. Attended daily meetings to discuss how to bring sets to life wtih given specifications from the DP and Director.
Summary
I'm someone who's passion is film itself - I want to experience all of film, from pre to post, so I'm open for any opportunity! I'm an organized, detail-oriented, optimistic team player who enjoys having fun at work, but still remaining professional.
Credits
7/23 – 8/23
Production Designer – Dream Devil
Tamaqua Film Studios — Film (Feature-length) Details
7/23 – 8/23
9/22 – 9/22
Second Assistant Camera – Night Voices
Lancaster, PA — Film (Short) — Dadley Productions Details
9/22 – 9/22
Anticipated DP's needs in camera changes - battery, lenses, camera set-up, rig building, etc. In charge of slatting and cooridinating with the Script Suervisor to keep takes organized/labeled correctly. I was also DIT on the project which included data wranggling for both the camer and audio departments - keeping data organized, backed up, labeld, and saved correctly.
7/22 – 8/22
Wardrobe Supervisor – I Think I'm Sick
Ingoma Films — Film (Feature-length) — Apple Slice Films Details
7/22 – 8/22
Make sure actors are picture ready in wardrobe needed for scenes. Kept wardrobe labeled and organized.
7/21 – 10/21
Production Assistant – Night of the Sicario
Saban Films — Film (Feature-length) — Premiere entertainment group
7/21 – 10/21
5/20 – 5/21
Boom Operator – Kill The Messenger (Season 1)
YouTube — TV — Cinecle Pictures Details
5/20 – 5/21
I made sure sound levels were appropriate for each cast member and made sure lavs were properly placed. I boomed for overall sound quality and made sure all channels were recorded in a sound mixer at the same time. I also produced some of my own sounds.
12/19 – 5/21
Swing – Locked In
Saban Films — Film (Feature-length) — Premiere entertainment group Details
12/19 – 5/21
Set up lighting/ran cable for all the shots of the film in various locations. Handled equipment associated with Grip & Electric team..both setting up and breaking down quickly and efficiently.
4/21 – 4/21
Wardrobe Assist – Penn Med
Corporate — Ronin Advertising Group Details
4/21 – 4/21
Shopped wardrobe, put looks together, managed talents measurements and style
10/20 – 12/20
Boom Operator – After Sophia
Broken Tile Productions — Film (Feature-length)
10/20 – 12/20
Orgs
Recos
Education
Class of '15
Full Sail University
Bachelor's of Science: Digital Cinematography Degree
Millersville University
My Gear
Skills
To message this person, you must be networked on Staff Me Up OR have an EMPLOYER or COMPANY Subscription. Upgrade to Premium!